Forms and Fees

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Click on the hyperlink below to select a document.
If you have any questions please contact the Engineering Review Division at 206.973.4750.

Permit Applications and Checklists

ROW Class A - Event Permit & Checklist

ROW Class B - Short Term Use/Over Legal Load Permit Application & Checklist

ROW Class C - Development Permit Application & Checklist

ROW Class D - Franchise Utility Permit Application & Checklist

ROW Class E - Haul Permit Application Package

Clearing and Grading (STE) Checklist

Concurrency Application

Variance Application and Checklist

Revocable Use Permit

Other Forms and Informational Materials  

Temporary Noise Variance
Reimbursement of After Hours Work
Standard Permit Conditions 
Revised Soil Amendment Requirements

Bond Quantity Worksheet

Interim Lighting Design Requirements (General Guidance, Reference Specifications 6-27, 8-20, 9-29)

2022 Annual Concurrency Report

Fees 

- Traffic Mitigation Fee: Fees should be computed for all new developments and change of use buildings impacting traffic volumes, per the latest edition of Trip Generation Manual, Institute of Transportation Engineers. See Transportation Impact Fees and the Fee Schedule for clarification.

- Performance/Maintenance Bond: Review and approval of the Bond Quantity Worksheet (BQW) for all proposed storm water facilities will be in accordance with the latest editions of the King County Surface Water Design Manual and the King County Road Design and Construction Standards. Developers will be required to secure the necessary Performance Bond to insure construction completion in a professional and timely manner.